Wallau

This MultiBusinessHub is located in the Rhine-Main region in close proximity to Frankfurt am Main and is considered one of the most strategically well-connected locations in the region. Situated directly at the Wiesbaden interchange with access to the BAB 3 and BAB 66, the site offers excellent supra-regional accessibility. Frankfurt Airport can be reached in approximately 15–20 minutes by car.

Facts

128.00 m²

Property

62.086 m²

Storage space

70.372 m²

Total building area

Facts

  • Sustainable construction method
  • Available approximately 24–36 months after lease agreement signing
  • Direct access to the Wiesbaden interchange (BAB 66 / BAB 3)
  • Top-quality fit-out standard

Unit 1.1

Warehouse 10.383 sqm
Mezzanine 619 sqm
Office 762 sqm
Total 11.764 sqm

Unit 1.2

Warehouse 10.383 sqm
Mezzanine 619 sqm
Office 762 sqm
Total 11.764 sqm

Unit 2.1

Warehouse 10.383 sqm
Mezzanine 619 sqm
Office 762 sqm
Total 11.711 sqm

Unit 2.1

Warehouse 10.383 sqm
Mezzanine 619 sqm
Office 762 sqm
Total 11.711 sqm

Unit 2.2

Warehouse 10.383 sqm
Mezzanine 619 sqm
Office 762 sqm
Total 11.711 sqm

Unit 2.3

Warehouse 10.383 sqm
Mezzanine 619 sqm
Office 762 sqm
Total 11.711 sqm

Unit 2.4

Warehouse 10.383 sqm
Mezzanine 619 sqm
Office 762 sqm
Total 11.711 sqm

Hall area

  • Clear height: up to 12 m underside of beam (UKB)
  • Column grid: 12 x 24 m
  • ESFR sprinkler system (FM Global)
  • Flatness according to DIN 18202 Table 3 Line 4
  • Floor load capacity: 7.5 t / m²
  • Loading docks: 1 per 1,000 m²
  • Ground-level doors: 1 per unit
  • Fire protection doors possible
  • Heating: heat pump
  • Fire alarm system
  • WGK III equipment

Office

  • Heating: heat pump
  • Air conditioning in office and social areas possible
  • Kitchenette: connections for tenant-side installation
  • LED panel lights: 500 lux
  • Fit-out quality according to user requirements
  • Sun protection: all offices and meeting rooms, electrically controlled per room

Outdoor facilities

  • Fenced site with optional barriers (with intercom system)
  • Entrance gate system electrically operated (optionally with induction loop in the exit area)
  • Loading yard min. 35 m
  • Car parking spaces

Sustainability

  • Sustainable construction method
  • EH 40 standard with heat pump
  • DGNB Gold

MultiBusinessHub

The MultiBusinessHub is a modern hub for companies with a need for efficient and innovative logistics space with perfect transport connections. In coordination with the respective municipality, we integrate this concept precisely at each location. We combine the uses of office, commercial, production, research and value-added logistics under one roof.

Map

Current Projects

Every project tailored to our clients like a bespoke suit.

All Projects
Landesärtzekammer Hessen (Lindley Quartier)
OstStern Gewerbe Ost
Stuttgart-West 1
Bürohaus Myliusstraße
Universum (Lindley Quartier)
DekaBank
Niederaula
Beschaffungsamt des Bundesministeriums des Innern
Moxy Hotel, Marriott <br />
(Lindley Quartier)